Monday, October 1, 2012

Shaking Table in progress

Construction of Shaking Table for FYP @ UTAR has started and the following works are now in progress;
1) place anchor bolts to fix the base steel frame onto the concrete base,
2) prepare the air supply tube to feed in pressurized air through the base steel frame,

Within this week of Oct. 1st, the basic arrangement of Shaking Table base will be completed and a test run of air flow from the base steel frame is to be carried out to uplift the floating shaking table. After confirming a stable floating of shaking table by pressurized air, next step of constructing a motor driven horizontal thrusting  for shaking will be commenced.

  